Walnut Tree Close


Client: Rushmon Homes
Contract: Design & Build
48 Apartments and Basement Car Park
Duration: 12 Months




Construction of one 5 and two 4 storey blocks, incorporating basement parking, necessitating vibrationless steel sheet piling to the perimeters of the site.  Temporary raking shores were installed to facilitate excavations to an 8 metre depth.

Insitu reinforced concrete formed the basement and frame of the buildings.

A central courtyard on the podium deck was waterproofed by post concrete crystallisation and finished with precast paving.